1. We conduct a survey of engineering systems in the following scope:

  • Inspection of hot water systems - description DHW systems, inspection of pipelines and circulation pumps, description of the preparation technology hot water and used water heaters, instrumental measurements - temperature measurements, determination of the thickness of corrosion deposits. Development of drawings with the application of pipelines and wiring of the hot water supply system on floor plans, indicating the diameters and linking to existing structures.
  • Inspection of heating and heat supply systems - inspection of the heat input and central heating, description of the heating system and wiring diagram of the supply and return lines, inspection heating appliances, carrying out temperature measurements, determining the thickness of the narrowing of the living section of pipelines, applying the heating system to floor plans.
  • Inspection of cold water supply systems - inspection of the water supply to the building, inspection of the metering station cold water and instrumentation, description of the water supply system, determination of the thickness of corrosion deposits in pipelines, drawing the cold water supply system on plans with the designation of diameters.
  • Inspection of sewerage systems - inspection of pipelines and sanitary fixtures, inspection of ventilation risers and revisions, determination of the slope horizontal pipelines, drawing sewer risers and devices on floor plans.
  • Inspection of ventilation systems - type identification ventilation system, inspection of ventilation ducts and ventilation equipment, determination of air exchange in the examined premises of the building, identification of defects and comparison with regulatory requirements.
  • Examination of waste disposal systems - examination of waste collection chambers, establishing the integrity and tightness of the shaft, establishing compliance with the requirements of design and regulatory documentation.
  • Inspection of gas supply systems - description of the structural diagram of the gas supply system, study of documentation for gas pipelines and equipment, determination of the compliance of the gas pipeline system with design documentation.
  • Survey technical condition drains - a description of the drainage system, reveal unacceptable damage - blockages, tightness of joints, the presence of gratings and caps, the presence of an electric heating cable.
  • Inspection of electrical networks and means of communication - description of the input-distribution device, inspection electrical cabinets on the floors, inspection lighting fixtures, inspection of low-voltage systems, drawing electrical panels and power supply wiring on building plans.
  • Inspection of engineering equipment - the actual condition of the used equipment for various purposes is determined. Physical and moral wear and tear is determined in accordance with the identified defects and malfunctions.


2. The composition of the technical report on the inspection of engineering systems and networks

1. Explanatory note- description of the subjects engineering systems

2. Inspection of heating and heat supply systems of the building

  • description of heating and heat supply systems
  • drawing heating systems on floor plans
  • instrumental examination of heating and heat supply systems, defects, conclusions and recommendations

3. Inspection of building ventilation systems

  • description of ventilation systems
  • drawing ventilation systems on floor plans
  • instrumental examination of ventilation systems, defects, conclusions and recommendations

4. Inspection of water supply and fire extinguishing systems of the building

  • description of water supply and fire extinguishing systems
  • drawing water supply and fire extinguishing systems on floor plans
  • instrumental examination of water supply and fire extinguishing systems, defects, conclusions and recommendations

5. Inspection of the building's drainage systems

  • description of drainage systems
  • drawing drainage systems on floor plans
  • instrumental examination of drainage systems, defects, conclusions and recommendations

6. Inspection of building electrical systems

  • description of power supply systems
  • drawing power supply systems on floor plans
  • instrumental inspection of power supply systems, defects, conclusions and recommendations

7. Results of calculations of existing loads on the building, analysis of input nodes for the possibility of increasing loads, identification of places for possible connections of new networks

8. Conclusions based on the results of the inspection of engineering systems of the building

10. Executive schemes - plans with applied engineering systems

Conducting communications - milestone preparing the facility for commissioning.

Inspection of engineering systems is carried out in new structures and in buildings already put into operation. This is a whole complex of works and events. In their course, experts evaluate engineering networks, their technical condition. As a result, the building owner receives information about network defects. Their functionality, ways to correct shortcomings are described in detail. It is analyzed how the engineering networks correspond to the project, sanitary requirements, building regulations.

The network survey is carried out both separately and during the assessment of the building.

Procedure value

Regular inspection of the technical condition of networks eliminates major accidents, damage to property, injuries to residents and employees.

An inspection of engineering networks is necessary if:

  • Accidents often occur in the building,
  • Systems have been refurbished
  • There was a major overhaul
  • The building has passed to another owner.


Engineering systems are assessed:

  • Plumbing (hot, cold water),
  • Heating,
  • Sewerage, water disposal,
  • Ventilation, air conditioning,
  • Fire alarm,
  • Power supply.

Our company is engaged in technical expertise at various levels. Technical inspection of engineering systems is carried out by high-level experts. We offer our clients several options for surveying engineering networks. The price will be from 30,000 rubles, the lead time is 5-10 working days. To choose desired option examination of engineering systems, call our managers. They will tell you in detail about the composition of the procedure. For the convenience of clients, a specialist travels to an object or to a meeting within the Moscow Ring Road.

DEPARTURE OF THE SPECIALIST

to a meeting or to an object legal entities within the Moscow Ring Road

What are we doing

Technical research of engineering networks is carried out by highly qualified specialists. They find out:

  • Are project requirements met?
  • Are there system defects?
  • Do the systems meet modern standards, sanitary and hygienic standards,
  • Do the systems have unused areas and how much they are needed for the operation of all systems,
  • How worn out are the building systems, whether they need repairs, how much to carry out,
  • How to modernize engineering networks, increase their functionality.

The result of the work of experts- a detailed document describing the current state of networks, their failures and features leading to a decrease in their efficiency. Experts give recommendations on elimination of defects, modernization, scheduled repairs.

Stages of work

Survey of engineering networks consists of 4 stages:

  • Initial - preparation for examination, analysis technical documentation. The package of papers includes passports for network elements, breakdown reports, drawings, projects.
  • Preparation - inspection of external elements, stop valves, fittings,
  • Detailed - examination with instrumental, laboratory methods. For measurements technical parameters high-precision instruments are used. Survey work is automated thanks to the new software. The customer receives detailed description the state of each node, its defect, operating parameters.
  • Documentary - final stage when all the identified data is summarized in a single document. This description of defects is used for repair work, modernization. Experts give recommendations on improving the life support systems of the building, replacing individual sections, and dismantling obsolete components.

Expert opinion

All information obtained during the research is documented in the final technical report. It describes the state of communications, the possibility of improving their efficiency, the causes of accidents, loss of potential in certain areas. They confirm the report data with other technical documents: drawings, projects, reports, photographs showing the initial state of communications, sheets describing defects.

One procedure for surveying engineering systems different buildings. Regular inspection of engineering networks guarantees the safety of residential and industrial buildings.

We guarantee professional, fast learning communication in every detail. Order from us an assessment of the technical condition of water supply, sewerage, heating, air conditioning systems. Research is carried out in our own laboratory, which ensures accurate results. We carry out construction expertise of various scale facilities in Moscow and the Moscow region.

Do you want to make sure the communications are working before buying a building? Order a technical study of communications in our company! We will save your money and save you from irrational purchases!

For directors and other high-ranking representatives of the population of the third planet from the sun


Upon completion, the customer will be issued a certificate and conclusion. As well as confirmation of the work performed.

Utility Survey Cost Calculator
Select building type

Commercial buildings Trade MFC Administrative Industrial Warehouse MFC Residential development

M2:

Survey
Design cost calculation
Price design work by main sections
from 10 999 m2, Vstr=31 892 m3
Settlement and explanatory note0 0
Analysis executive documentation, drawing up a list of defects, photographing the object of examination0 0
Power supply system, photographic fixation0 0
Cold water supply system, photographic fixation0 0
DHW water supply system, photographic fixation0 0
Drainage system, photo fixation0 0
Heating ventilation and air conditioning, heating networks, photographic recording0 0
Communication networks, photography0 0
Gas supply, photographic fixation0 0
Concrete strength measurement by ultrasonic method0 0
Carries out the opening of structures, selection of concrete samples, determination of the composition and reinforcement0 0
Development of building plans in PDF format based on BTI0 0
Development of plans for the placement of elements of the internal engineering systems of the building (risers of VK, OV, placement of ASU, placement of inputs engineering communications) 0 0
Determination of the geological conditions of the building site (properties of foundation soils)0 0

  1. Sample for design and survey - KP, TK, ESTIMATE technical examination of engineering systems up to 1500 m2
  2. Sample for design and survey - KP, TK, ESTIMATE technical examination of structures up to 1500 m2
Survey of engineering networks treatment facilities

Inspection of treatment facilities- begins with the preparation of technical specifications. Goes to objects Chief Engineer or CEO appointing specialists responsible for the specific production of works. At the end, there will be detailed plan, including the results of research, a list of equipment with recommendations for use and, of course, details of modernization.

Inspection of water supply systems

Inspection of water supply systems- a set of measures aimed at clarifying the actual and obsolescence of the engineering water supply system. Includes detailed visual inspection specialists, control with the help of narrow-profile equipment and settlement work. Upon completion, a study report is drawn up, which details the results, recommendations, best practices modernization and maintenance.

Inspection of electrical networks

Inspection of electrical networks- usually initiated by the company on the fact of excess electricity costs or on the onset of an emergency. Networks, electrical installations, input devices are examined directly. Based on the issued conclusion, actions are taken to improve, repair, and dismantle systems.

Survey of engineering networks ventilation ducts

Inspection of ventilation ducts- this includes checking the design documentation and working calculations to assess the feasibility of the installation. Control of the system, air channels and nodes. At the end, recommendations for effective use, repair or modernization are given, if necessary.

Examination of the ventilation system

Examination of the ventilation system– comes down to measuring parameters (air flow rate, transparency, amount of suspended particles, humidity) and comparing the obtained data with those calculated for a particular system. In case of a significant discrepancy, the system is examined for incorrect operation of nodes and components.

Ventilation inspection report

Ventilation inspection report– includes data shown by calculation when designing the system and practical parameters operating system. With a significant discrepancy between the parameters, measures are indicated to equalize them.

Exhaust ventilation in production

Exhaust ventilation in production- it is extremely necessary for pumping the required amount of clean oxygen-saturated air into the room, removing it outside working area harmful to health human products of production. The best option of all possible systems ventilation in most types of production.

Validity of engineering surveys- defined by law as 2-3 years. The results with a period of more than 3 years are included in the history of engineering surveys, they are necessary for the conclusion during the re-reconnaissance study.

Obtaining GPZU, SPOZU in Moscow

Obtaining GPZU, SPOZU in Moscow- perhaps in the committee for urban planning and architecture in the city of Moscow, or in the Moscow Committee for Architecture.

First of all, you need to collect a package of confirmed papers. The term of rendering services from the moment of submission of documents to issuance: 30 days.

What is GPZU, SPOZU

What is GPZU, SPOZU- a set of documents drawn up in an appropriate manner by a responsible person, Scheme of a planning organization land plot or as an abbreviation. Describes in detail the special special purpose specific territory, characteristics and possibilities for construction.

Samostroy

Samostroy- a structure erected without proper permits and approvals. In places not intended for that.

How to legalize unauthorized construction

How to legalize unauthorized construction- you should start by calling a commission from the local authorities of the municipality. Which will issue the necessary confirmations. Directly the decree on the legalization of the building will be obtained in the arbitration court.

Legalization of unauthorized construction

Legalization of unauthorized construction- we apply the latest research and achievements both technical and legal terms so that you can solve the problem with minimal effort.

Temporary structure, definition

Temporary structure, definition- Recognized structures and structures that can be moved without causing disproportionate damage. An integral structure, not connected with the land and utilities, which does not have a rigid foundation, which is not possible to release without destroying the structure.

List of documents for putting the object into operation

List of documents for putting the object into operation- this includes: a statement from the developer and investor on the issuance of documents for putting the object into operation, confirmation of acceptance, a document confirming the parameters of the erected object in accordance with the current regulations. Papers confirming the compliance of the erected building with the technically approved project.

Procedure for registering a land plot

Procedure for registering a land plot– statements describing the purpose of acquiring rights to the site, supporting document indicating perpetual use or lifetime ownership and justifying the reason. An extract from the household book, an act on the receipt of land, is issued by the authority local government. One document confirming the owner of the land. Confirmation of payment of the state duty and a passport of a citizen of the Russian Federation.

The composition of the redevelopment project

The composition of the redevelopment project- includes: a diagram of the device of partitions, reinforcement of openings. Systems of water supply, sewerage and heating.

Plan before work starts. Measures to ensure industrial and fire safety. Project manager confirmation.

The cost of the renovation project

The cost of the renovation project- includes the cost of drawing up a design, draft and working draft.
Author's supervision.
A significant proportion is the preparation of the necessary documents.
Refurbishment project- pursues the goal of ensuring complete structural safety of engineering systems, operational characteristics and structure structures. Project design standards are regulated in accordance with GOST 21.101-97 and GOST 21.501-93.
Development of a redevelopment project- begins with the provision of documents from the Bureau of Technical Inventory and a sketch of redevelopment.

Mezzanine

Mezzanine- in world practice, an additional room built into the main body of the building, in Russian architecture - a shelf in the upper part of the room used to store a home scrub.

Sample act of inspection of the object

Sample act of inspection of the object- filled in by members of the commission that examined the property and makes a conclusion. Fixing the data in the survey report.

The act of inspection of the property- a document confirming the readiness of the property for operation. Compiled for newly erected and renovated buildings. Compiled by an authorized commission of administrative authorities. It has the task of improving the overall picture of construction.
The act of inspection of buildings and structures sample- a document confirming the inspection of the structure by a group of persons. For the next inspection of the building, only competent persons should be involved, who are obliged to evaluate all the identified shortcomings in the building.
Building Inspection Certificate Sample– cannot be used as a supporting document. Applicable for familiarization with the formal rules for filling out reports.
Inspection act building structures - confirms the control and examination of the condition of the structures of the building and structures. In the case of a defect that cannot be eliminated without dismantling the structures, a separate act of eliminating the defect is drawn up.

Control of building structures

Control of building structures- It is carried out upon the erection of a building or structure. In the future, scheduled or unscheduled, it takes place in the presence of a competent commission with the registration of results. And entering the data into the current documentation for further analysis.

Expert opinion sample document- used for the initial drawing up of the conclusion. Can be used as a secondary confirmation, not suitable as a final expert opinion.

Examination of buildings and structures

Examination of buildings and structures- aims to determine the residual resource and technical condition of buildings and structures. An assessment of how much the erected building meets the requirements and how much it meets the industrial safety requirement.

Technical Inspection Certificate- carried out in order to confirm the technical inspection of the building. In order to safely operate the building, a commission of authorized members is needed to confirm the readiness of the building for operation.
Building inspection report sample– can be downloaded from our website. It is used as a draft version of the document submitted to the competent authorities for greater accuracy and error reduction.
The act of inspection of buildings and structures- captures the state of the object at the present moment. It details the defects. All changes are recorded in writing, after which the document is certified by the parties of the customer and interested third-party organizations. Does not display the overall set of technical condition.
The act of inspection of the construction site- compiled at the time of a scheduled or unscheduled inspection of the construction site to identify technical details and compliance technological operations technical assignment.
Act of defecation form- is necessary only in cases of finding a significant defect in the structure of the building and structure. The form can be downloaded from the website of the local authority "Rostekhnadzor".
Fault detection act- a document certifying that the building and structure cannot be used for its intended purpose. Has severe defects, needs serious repairs. Compiled by an authorized commission of specialists.
Opening in the bearing wall cost - the price consists of the complexity of the technical implementation. In particular, the material of the wall, brick, monolithic concrete Or a panel house. Based on the material, choose the tool. Depending on the chosen tool and the classification of specialists, the final figure is added up.

Opening reinforcement project

Opening reinforcement project- is developed by design organizations - members of the SRO or the authors of the building project. According to housing law, openings in load-bearing walls significantly affect safety. Therefore, they must be properly drawn up at the Moszhilinspektsii.

Reinforcement of metal beams

Reinforcement of metal beams- It can be local or general. Local reinforcement due to welding of additional stiffeners. General - creation lower belt sprengels, removing the reference voltage.

Concrete expertise

Concrete expertise- reconciliation of the actual quality of the product with the characteristics shown in the project documentation.

The highest quality strength measurement is carried out using concrete cores taken from the finished building.
Determination of concrete strength- it is possible to determine by the method of destructive control, indirect non-destructive and direct non-destructive. Ultrasonic testing. Regardless of the method or equipment, the measurement error is never less than 30%.
Concrete testing laboratory- concrete composition is complex, and therefore, an analysis of each component is necessary for evaluation. Lab picks required composition concrete, depending on the technical specifications, as well as the composition of gravel, cement, sand. Determination of properties of vibrations and reinforcing bars.

Methods for quality control of welded joints

Methods for quality control of welded joints– Distinguish destructive methods of control. Mechanical testing the model of the welded product is subjected. And unbrakable control: visual, pneumatic and hydraulic tests. Magnetographic and X-ray control.
Ultrasonic control.

Flaw detection laboratory- a set of tools and methods aimed at the production of flaw detection control by all accessible ways: destructive and non-destructive testing, ultrasound examinations, visual control, etc.. Engaged in the development of methods for detecting defects and creating practical devices based on their principles.
Checking the quality of welds- there are several types of welds, depending on the purpose, the quality also varies. Accordingly, control methods.
Weld test- carried out after cooling, may vary depending on the purpose of the connection. Distinguish control visual, ultrasonic and x-ray.
Weld control- visual, ultrasonic or x-ray method for examining the result of welding work. To check the quality of the connection.

Design of buildings and structures

Design of buildings and structures– is carried out on the basis of the terms of reference, geological conditions and regulatory acts and laws.

Project documents undergo multiple checks through authorities and regulatory authorities and are approved only after general agreement.
Building project- a graphically and mathematically modeled and documented building model used to create an estimate and more detailed study of operations during the construction of a building.
Construction design - development of the most optimal technological process in accordance with the economic models given specifications and its geological possibilities.
Building facade design- settlement and graphic works, as well as a general and sectional plan of the facade of the building, taking into account the specific site and the specifics of its operation and construction.
Building design price- design cost, a complex set of key costs (work of specialists, costs of work, etc.)
Building design cost- the total cost of creating a project with the participation technical specialists, development solutions. As well as overhead, legal and other expenses.
Sample projects– finalize, refine and rework standard projects for your tasks, technical solutions and wishes. Sample project usually the basis of all private projects is used to reduce the same type of work.
Project shopping center - compiled taking into account supply chains, human flows, urban communications. Closely integrated with the housing economy and infrastructure facilities.
Project working documentation, working draft - a set of transitions, operations and plans from different angles for the production of specific technical actions (masonry, finishing, facade plan, section plan).
What is project documentation- a set of graphic and calculation materials that make up the apotheosis of preliminary work in preparation for the construction of a building and structure.
Design of industrial facilities- similar to other types of design, but taking into account financial and budget analysis, calculations of product sales. Designing with the implementation of all possible measures for the successful implementation of the project.
Production design- in accordance with the requirements of regulatory and technical acts. Subject to use production equipment and materials. The basis is a project developed specifically for you, taking into account the preferences and recommendations of the customer. No generic solutions.

measurements

measurements- a set of actions aimed at accurately measuring the dimensions of the room (width, height, volume, area). Necessary for repair, cost estimation installation work Oh. When installing communications cosmetic repairs and other activities.

Measurement of premises- the primary procedure is integral to the examination, repair, redevelopment. Other technical or legal actions in relation to the premises.
Room measurements cost- this includes the cost of remuneration to specialists, overhead and depreciation of equipment. Also, the price varies greatly depending on the size.

The need for such a study as a technical examination of building communications may arise for many people. Basically, it is carried out in order to determine the quality of the installation work. Also, the examination of engineering communications allows the compliance of the equipment under study with the design requirements. So this service is often used by a variety of organizations organizations.

What does it includeexpertise of engineering systems and communications?

During its implementation, various studies can be carried out. These include:

    Power supply expertise.

    Water supply expertise.

    Examination of ventilation systems.

    Heat supply expertise.

    Examination of sewer systems.

    TV research.

The purpose of the engineering expertise

Independent expertise of engineering communications aims to establish the state of engineering networks at the time of the verification. It also reveals boundaries functionality networks and their compliance with the information specified in the documentation. Communications expertise also allows you to determine how engineering networks are suitable for further use. In some cases, the expert opinion may describe measures to improve the system. It can be both modernization and repair.

Objects of research for the examination of communications

In addition to studying engineering communications, during the examination, various documentation related to this building is also checked. This also applies to documents on the design and operation of the building.

Examination deadlines

Many factors influence the duration of a study. For example, great importance are the size of the building. The more massive it is, the more time it takes to study its various elements. It is important to note that the study of some building systems requires the use of special equipment. Therefore, only experienced specialists with suitable tools should carry out the examination. Can also be applied various methods. In particular, when studying electrical system an electrical audit can be carried out.

When is a communication review carried out?

Basically, this study is carried out:

    In case of disputes between customers and the contractor. This may be due to an increase in the terms of work and an increase in the estimate.

    Various emergencies affecting engineering networks. These include fires, floods and more.

    When starting, as well as debugging engineering networks.

    When buying and selling a building. The study allows you to assess the state of engineering networks.

Expertise is very useful on the eve of a major overhaul of networks. Obtaining accurate information about engineering networks allows you to optimize the cost of their repair.

Order an independent examination of engineering communications

Employees of our Center for Independent Construction Expertise have been engaged in research of various engineering networks for a very long time. Thanks to their extensive experience, they are able to perform expertise on high level and in a short time. Separately, it should be noted that our employees have at their disposal all the necessary modern tools. Thanks to this, any additional research is carried out without delay and with high precision. We are ready to fulfill an order of any level of complexity at a very affordable price.

Price and terms for Expertise of engineering communications

Price from 15000 rub.

Deadline from 5 days.

Today, engineering networks are an important part of not only separate building, but also a large system, with the help of which the facilities are provided with the necessary resources. Particular attention is paid to their condition, because it is very important to maintain the system's performance and prevent possible breakdowns in a timely manner.
As a rule, technical inspection of engineering networks takes place during their operation. Wear and tear is an integral part of the use of the system, it occurs under the influence of natural external factors. On average, networks can last for 10-20 years without repair and additional work, and the service life depends on external conditions, the timeliness and quality of the repairs carried out.

Why is the intervention of specialists in this matter necessary? Even experienced customers do not have enough knowledge to accurately determine the state of the system. Would need a large number of additional funds, many related works. Naturally, this should only be done by professionals with extensive experience. Only specialists will be able to accurately determine all the necessary parameters, analyze the data obtained and present a conclusion on the results of the studies.

What cases require analysis?

There are a number of factors under which an inspection of engineering networks is carried out. It all depends on the needs of the customer, he can order any expertise for these systems.

In some cases, customers need an initial analysis of the network after it is laid. It is not uncommon for a company to have doubts about its contractor and want to check whether the work was done correctly by the contractor. For this, the following operations are carried out:

  • Careful inspection of the system to obtain required parameters.
  • Study of the received data and project documentation. Specialists review work plans and identify possible deviations during networking.
  • Compliance with the standards is checked, because the service life depends on all these parameters.
  • If you doubt the estimate of work provided by the contractor, then specialists will be able to determine the cost of installing the system and prevent the possibility of overestimation.
There are other cases where system surveys may be required. One of the options is that it is necessary to carry out reconstruction and it is required to check the current state in order to determine the possibility of such work.

Often, the survey is carried out before a major overhaul of the system. The main task of specialists is to assess wear and tear and current violations in order to answer the question of the need for a large-scale restoration of equipment.

Another factor is the change of the tenant or the transfer of networks from one balance sheet to another. In this case, it is important to determine what state the system is in this moment and how soon it will require repair work, including a major update. Additionally, the current state of the systems during transmission is recorded, and you are presented with official documents with expert opinion.

If frequent breakdowns occur, then this is another reason to invite specialists for an inspection. Only professionals will be able to check the entire area, determine the level of wear and find possible violations that cause frequent malfunctions system and its failure.

Networks being inspected

Technical inspection of engineering systems is carried out for almost all types of networks, depending on the requests of the customer. It can be carried out both completely for all elements, and for individual elements.

What parts of the system can be inspected:

  • Debris removal shafts, their current condition, the possibility of operation and repair, compliance with the original design.
  • Air ducts are often checked. Specialists inspect all ventilation systems in the room and check their condition.
  • Inspection can be carried out for drains. The task of specialists is not only to check the main parameters, but also to create a diagram that indicates the tightness and possible gaps.
  • It is important to control the engineering equipment itself. It can simply become obsolete or wear out during use, and the task of specialists is to determine the possibility for further exploitation.
  • Much attention is paid electrical networks. The main task is to check all the components, from the shields to the lighting. Additionally, a plan is drawn up, it indicates the location of individual elements, wiring, etc.
  • A technical inspection of the heating system is carried out in order to determine its performance, the correct arrangement, compliance with standards and the possibility of further operation.
Recall that the survey is often carried out not only during the transfer to the balance or with frequent breakdowns. Experts recommend inspecting systems from time to time, determining the current condition and the need for repair of individual elements. Timely detected malfunctions are much easier to eliminate than their further consequences and serious breakdowns.

You may also need an assessment in the process judicial trial. If you have a dispute with another organization that cannot be resolved through negotiations, then you need to involve experts in this matter. They will perform all the necessary inspection operations and present their own conclusion with the answer to all the questions raised.

Experts provide an independent opinion during their work. They do not have the task of defending the interests of one of the parties, and this can be called the main value of the help of professionals. They provide an objective solution that can be used in legal proceedings.

About the process

Technical inspection of equipment and networks is carried out taking into account two determining factors:

  • Much attention is paid to physical wear, it is he who becomes the main problem during the operation of systems. This factor depends on the general condition, it is determined by current indicators, the number of repairs and restoration work.
  • An equally important indicator is obsolescence. When determining it, possible violations during the arrangement are taken into account, which affect General characteristics systems. Another parameter is the obsolescence of equipment, as a result of which it no longer meets modern requirements.
How the examination process is carried out:
  • To begin with, you contact the company, determine the scope of expert work that you need.
  • Specialists prepare a contract for the provision of services, and it is signed.
  • Experts go to a specific object, conduct necessary examination and perform a range of required measurements. The experts have at their disposal modern technology for complete work.
  • Next, employees analyze the results, compare them with the work project, current regulations and start preparing the report.
  • In conclusion, they write down the deviations and violations found, give a general assessment of the state of the system and answer other questions posed by the customer.
What may be required by specialists in the process of work:
  • Project documentation.
  • Drawings of the system used for the preparation of work and during their implementation.
  • Information on the repairs carried out, the range of restoration work performed.
  • Other documents providing information about the object of the survey.
Who is ready to analyze?

Naturally, for the implementation of the survey, you will need to turn to professionals who can cope with any tasks. It is very important to choose a company with extensive experience in this area, because the quality of the assessment work depends on it.

Our firm is always ready to provide you with its own support in this matter. The company employs professionals with extensive experience and specialized education. They will be able to fully cope with their task and conduct a comprehensive analysis for engineering systems. The company does not delay the deadlines and was able to combine a short examination time with high quality work and consideration of all possible factors. We will be provided and the best prices according to your order.

Loading...
Top