About the rules for drawing up estimates for finishing work. How to make an estimate for finishing work Estimate for finishing work sample

(Examples are considered on the basis of TER-territorial unit prices, analogously and FER-federal unit prices,
according to the Reference Estimate and Regulatory Base (new edition))

Let's analyze example No. 5 of budgeting, this example will be more complicated:

For example, let's imagine that the Customer asks to repair the walls in the apartment.

We take a tape measure, a sheet of paper, a pen or pencil and leave to inspect the repair site, i.e. we go to the object.
Arriving at the site, we find out that the walls need to be repaired in only one room.
Here, on the spot at the representative of the Customer, we clarify what exactly the Customer wants.
The customer wants (only the walls are still considered without slopes):

1. Clean the walls from water-based paint;
2. Align the plaster walls;
3. Apply putty;
4. Paint the walls with water-based paint.

Ask the Customer for all the details, this will help you when choosing prices in the future.
After asking the Customer, we agreed that:

  1. We will first clean off the old paint from the walls;
  2. Prime the walls before leveling the plaster with a primer, to adhere a new layer of plaster to the old one (in other words, so that our plaster does not fall off);
  3. Align the plaster of the walls with a mixture of plaster "Rotband", the thickness of the plaster layer is up to 10 mm.
  4. Then prime the walls again with a primer, before applying putty and water-based paint, so that all this does not crack, fall off and adhere tightly to the wall.
  5. Apply putty on walls to even out wall defects after plastering;
  6. And the last thing, to paint the walls with water-based paint, the coloring was discussed with the Customer, it will be improved.
Stage II:

We figured out the problem, now we need to decide on the volumes. It is good if the Customer gives you a copy of the plan of the premises, which shows the dimensions of the premises being repaired. And if not, then we will give a tape measure and measure the width and length of the room, as well as the width and height of the door and window openings with a tape measure ourselves.
Let's say that when measuring the width of the room, we got 4.0 m, the length of the room is 6.0 m, the height of the room is 2.85 m. The height of the doorway is 2.0 m, the width is 1.0 m, the height of the window opening is 1.5 m , and the width is 1.4 m.
Be sure to measure the dimensions of the door and window openings in the room. When calculating the volume of walls, we will subtract the area of ​​the door and window openings from the total total area of ​​the walls of the room, since the amount of work to level the wall plaster is determined by the area of ​​only the surface that will be leveled. (GESNr 81-04-OP-2001 State elemental estimated norms for repair and construction work. General provisions. Calculation of the scope of work (edition 2009), p. 2.42. The plastering area of ​​\u200b\u200bthe internal walls should be determined minus the areas of openings along the outer contour of the boxes and the area occupied by the platbands, and the height of the walls is taken from the clean floor to the ceiling.)

But, the area for painting walls with water-based paint is determined without deducting the areas of openings and without taking into account the areas of window and door slopes only if we paint the slopes too. (GESNr 81-04-OP-2001 State elemental estimated norms for repair and construction work. General provisions. Calculation of the scope of work (edition 2009), p. 2.51. The area of ​​​​painting internal surfaces with water compositions is determined without deducting the areas of openings and without taking into account areas of window and door slopes, side surfaces of niches, but taking into account the areas of pillars and sides of pilasters.)

But since we do not paint the slopes, but only the walls, therefore, we take the area of ​​painting the walls with water-based paint specifically according to the area of ​​the surface to be painted.

Having mentally photographed the walls and measured them, we return to our place of work and proceed to the second stage.

We consider the area of ​​\u200b\u200bthe walls: (6.0 + 4.0) * 2 * 2.85-2.0 * 1.0-1.5 * 1.4 \u003d 52.9 m2.
Now we write in the defective statement what we need to do:

  1. Remove paint from wall surfaces by hand. We write to the defective statement - Manual cleaning of the surface of the walls from paints 52.9 m2.
  2. Prime the walls before leveling the plaster with a primer. We write to the defective statement - Priming the surface of the walls with a primer before leveling the plaster 52.9 m2.
  3. Align the wall plaster with a mixture of plaster "Rotband", the thickness of the plaster layer is up to 10 mm. We write to the defective statement - Leveling the plaster of the walls with a dry mortar mix "Rotband" up to 10 mm thick 52.9 m2.
  4. Prime the walls after leveling the plaster, before applying putty and water-based paint. We write to the defective statement - Priming the surface of the walls with a primer before applying putty and water-based paint 52.9 m2.
  5. Apply putty to the walls to even out defects after plastering. We write to the defective statement - Applying putty on the walls to level defects after plastering 52.9 m2.
  6. Paint the walls with water-based paint. We write to the defective statement - Improved painting with water-based compositions for wall plastering.
Notice one important detail, all the details are written in the defective statement.

Specifically, in our case, we wrote not just "Leveling the plaster of the walls with a dry mortar mix" Rotband ""; "Improved painting with water-based emulsion compositions of the walls", and "Leveling the plaster of the walls with a dry mortar mixture" Rotband "thick up to 10 mm"; "Painting with water-based compositions on plaster improved walls" as requested by the Customer.
Why such details, you will understand later, when looking for prices.
Well, in our case, the defective statement is ready, see below:


"APPROVE"

________________ /______________________ /

"______" ____________________ 20___

Object: Apartment

DEFECTIVE STATEMENT

to repair the walls in the room

No. pp Name of works and costs unit of measurement Quantity
1 2 3 4
1. Manually cleaning the surface of the walls from paints m2 52,9
2. Priming the surface of the walls with a primer before leveling the plaster m2 52,9
3. Leveling wall plaster with dry mortar
"Rotband" up to 10 mm thick
m2 52,9
4. Priming the surface of the walls with a primer
before applying putty and water-based paint
m2 52,9
5. Applying putty on walls to even out defects after plastering m2 52,9
6. Improved water-based painting on wall plaster m2 52,9

Compiled by: _________________________________________________________
(position, signature, full name)

Checked by: _________________________________________________________
(position, signature, full name)


After the defective statement is ready, it is given to the Customer for approval.
And after the Customer approves the defective statement, we begin to draw up an estimate.

Drawing up a budget.
To draw up an estimate, we need TERr - Territorial unit prices for repair and construction work; TER-Territorial unit prices for construction work.
If you are already familiar with the estimate program, then all these TERr, TER are in it.
So, we have cleaning of the old paint, leveling the plaster, then painting with new paint, i.e. repair, so we are looking for prices first in the repair sections - TERr - Territorial unit prices for repair and construction work. And if there are no prices suitable for us in the repair sections, then we are looking for them in the construction parts.
But when repairing, prices are always initially searched for in the repair sections.
Initially, we manually clean the surface of the walls from paints. There is no direct quotation for this type of work, so we will look for a quotation applicable. Since the first type of work is related to paints, i.e. cleaning from paints, then we are initially looking for TERr-painting work. This will be TERr Section 62 Painting.
Moving on to TERr section 62. Painting work, we're looking for paint stripping. This will be the applicable rate TERr 62-41-1.
For the first item in the defective statement, we found a price - TERr 62-41-1. We put it in our budget.

Now we are looking for a price for the second item on the defective list.
The second type of work - priming the surface of the walls with a primer before leveling the plaster, we will not look for yet, since usually the priming is included in the prices for leveling the plaster.

We are immediately looking for the third type of work - leveling the plaster walls with a dry mortar mixture "Rotband" up to 10 mm thick.

Since the third type of work is related to plaster, i.e. leveling plaster, then we are looking for TERR-plaster work. This will be TERr Section 61 Plastering.
Further in TERr section 61. Plastering, we are looking for leveling plaster walls with dry mortar up to 10 mm thick. This will be the rate TERR 61-1-9.
We see that the price of TERr 61-1-9 is open, which means that the cost of the main material (in our case, this is the Rotband plaster mixture) must be taken in addition to this price according to TSTS, since in the price of TERr 61-1-9 he (the main material) is not taken into account. Therefore, in addition to the price of TERr 61-1-9, we additionally take the mixture of plaster "Rotband". The cost of materials is searched for in the TSTS collection. TSTS - a territorial collection of estimated prices for materials, products and structures used in construction. It consists of five parts:

  1. TSTS 2001 Part I. Materials for general construction works
  2. TSSC 2001 Part II. Building structures and products
  3. TSSC 2001 Part III. Materials and products for sanitary works
  4. TSSC 2001 Part IV. Concrete, reinforced concrete and ceramic products. Nonmetallic materials. Ready-mix concretes and mortars
  5. TSTS 2001 Part V. Materials, products and structures for installation and special construction work
Since the leveling of plaster is related to work with mortars, we are looking for a price for the cost of the Rotband plaster mixture according to TSTS 2001 Part IV. Concrete, reinforced concrete and ceramic products. Nonmetallic materials. Commodity concretes and mortars. This will be the price of TSTS 402-0077. In addition, we take the coefficient for the consumption of the material, the consumption of the Rotband plaster mixture according to TSTS 402-0077 will be 9.6 kg per 1 m2 with a layer thickness of 10 mm: 52.9 * 9.6 = 507.84 m2

For the second and third points in the defective statement, we found a price - TERr 61-1-9. We put it in our budget.

Next, we move on to the fourth and fifth types of work - priming the surface of the walls with a primer before applying putty and water-based paint and applying putty on the walls to level defects after plastering. We will not be looking for these types of work, just like the second one. Let us first consider the sixth type of work - Improved painting with water-based compositions for wall plastering, and then we will explain why we missed the fourth and fifth types of work.

Since there is no price in TERR for painting with water-based compositions for improved wall plastering, we turn to the construction parts of TER - Territorial Unit Prices for Construction Works.
We are looking for in TER - finishing work. This will be TER part 15. Finishing work. The rate that suits us is TER 15-04-005-03.
Consider this price TER 15-04-005-03 in more detail, an interesting price.

First of all, we need to find out whether priming and putty are included in the price of TER 15-04-005-03.
We look at GESN 81-02-Pr-2001 State elemental estimated norms for construction work. Annexes (edition 2009), Annex 15.11 - Scope of work when painting with polyvinyl acetate water-based compositions - improved for plaster. Here, in the table, we see that primer and putty are already included in the price for painting with water-based compositions for improved wall plastering. And therefore, we will not take separate prices for priming and putty before painting the walls with water-based paint.

At the rate of TER 15-04-005-03, you may have a question: "How is priming included in the price, if the price does not include the cost of this very primer according to TSSC?"

We explain that the paint consumption as part of the price TER 15-04-005-03 for improved painting is so high that part of this consumption can replace both the consumption of the primer and the cost of the primer itself. Therefore, it makes no sense to correct this price for the primer (see Letter of the Ministry of Regional Development of the Russian Federation dated July 21, 2009 No. 22729-IP / 08).

Now we can say that for the fourth, fifth and sixth points of the defective statement, we have found a suitable price - TER 15-04-005-03.

The estimate is almost ready, it remains to add all the necessary coefficients from the relevant MDS - Methodological documents in construction, such, for example, as in paragraph 4.7. MDS 81-35.2004, if there are complicating factors and conditions for the production of these works, and reducing factors for overhead costs and estimated profit during repairs, this is also from MDS ( read more often and study MDS before making estimates) and you can release it.
The estimate will look like this, see

Just do not forget that the estimated prices in the collections and programs are based on the prices of 2000. Therefore, you must also multiply the final estimated cost in this estimate by the corresponding conversion index to current prices.
The index of conversion to current prices is different for each region.

After all that has been done, the finished estimate can be submitted for approval to the Contractor, and then for approval by the Customer.

AND NOW TRY TO SOLVE THE PROBLEMS OF BUDGETING AND CHECK YOURSELF IN THE SECTION:

A construction estimate is required, which will take into account all the costs of the work of builders and materials.

How to make an estimate for repairs with your own hands?

To begin with, it is necessary to evaluate and record the volume of construction work - the area of ​​\u200b\u200bthe floor and ceiling (they differ), the area of ​​\u200b\u200bwall covering, the length of products calculated in running meters (cornices, skirting boards), as well as piece work - replacing windows and doors.

Where to get sizes?

Measure personally! Seven times each name. A tape measure and a calculator (to immediately calculate the area) are best friends.

Where to get rates?

Google - there are enough price lists on the sites. Take for your estimate some average cost. The cost of all works is estimated per unit of measurement - m 2 , pgm, piece work, garbage disposal in m 3 .

How to count the amount of building materials?

The calculation of estimates for those who make repairs on their own comes down to the usual calculation of the required amount of materials.

There are two dangers. Buy a little, and then not find the right one. Buy with a large margin and overpay heavily.

To avoid such scenarios, we apply a simple rule:

  • we calculate the consumption of a unit of each material per unit of length or area (a roll of wallpaper or a can of paint per 1 m 2), or the size of a unit of the material itself (the area of ​​one sheet of drywall, porcelain stoneware, etc.)
  • we multiply the consumption by the data of our measurements - the total area, length or number.
  • add ~ 10-30%, depending on the material.

What kind of work should be included in the estimate for the repair of an apartment?

  • Preparatory stage
  • Rough work
  • Related works
  • fine finish
  • Purchase of materials
  • Garbage removal

For each stage you will get a separate mini-estimate.

Do you need a budgeting software?

Special programs are not needed. Enough MS Excel and basic knowledge. 1st column - type of work, 2nd - units of measurement, 3rd - cost and 4th - total (multiply 2 and 3 columns).
You can place each repair stage on different document tabs.

This is just the simplest option. With certain skills, you have where to turn around - the possibilities of Excel are inexhaustible!

Estimate for the preparatory stage of the repair

The estimate always includes demolition work. They include:

  • dismantling of floor coverings - linoleum, carpet, tiles,
  • cleaning the ceiling from whitewash and paint,
  • cleaning of wallpaper and dismantling of plaster (all in square meters),
  • remove the plinth (in linear meters),
  • piece by piece dismantling of door blocks,
  • all electric points (chandeliers, sconces),
  • all plumbing points - toilets, sinks, heated towel rails, bathtubs and faucets.

The dismantling of walls is recorded in a separate column. Bearing walls cannot be demolished, but in special cases openings can be moved into them. Most often, moving an opening in a load-bearing wall costs 3-4 times more than dismantling an entire partition. Please note that such a process must be approved by the housing inspection and requires special equipment.

You can save at this stage if you are able to do some of the listed actions yourself.

Estimate for draft work

At the stage of rough work in the repair, there is a lot of hidden work, for example, preparing surfaces for fine finishing.

What works will be included in the estimate:

  • For ceilings - cleaning from nabel, sealing seams, leveling (plaster), putty and primer.
  • For walls - leveling with plaster, putty and primer.
  • For the floor - a screed device, in wet rooms a waterproofing device, when installing a warm floor, laying out the cable, installing sensors and connecting to the mains

An additional type of work is the connection of electricians and plumbing.

The budget should also take into account:

  • scraping walls for electrical outlets,
  • laying cables in the corrugation,
  • laying of water pipes,
  • laying sewer pipes.

Estimate for related work

Usually organized by specialized companies.

What activities need to be taken into account when budgeting?

  • installation of telephone, internet and TV cables, intercom,
  • installation of air conditioners,
  • kitchen assembly,
  • replacement of windows, includes the installation of slopes and window sills.

The Internet is most often now laid free of charge, the main thing is that there is a provider in the house. And the rest - you should contact the organization in advance for calculations - calling measurers is now also mostly free!

Drawing up a budget for cleaning

After marking the preparatory work, they proceed to the calculation of the cost of finishing the premises.

What works can be included in the estimate?

  • ceiling - painting (before finishing the walls);
  • installation of stretch and rack ceilings;
  • walls - painting, plastering, wallpapering, tiling;
  • floor - laying ceramic tiles, parquet, laminate, linoleum, carpet, parquet;
  • molded products - cornices, moldings, plinth
  • plumbing installation;
  • installation of electrical outlets (sockets, switches);
  • installation of heating radiators;
  • door installation;
  • installation and installation of chandeliers and lamps.

The assembly of furniture and built-in wardrobes can also be taken into account in the estimate. But, you can skip it for now, as many furniture manufacturers do free assembly or include its cost in the total bill when ordering furniture.

Purchase of materials

If you hire a foreman, the purchase of materials is also included in the estimate. Most often, the purchase and delivery to the site costs approximately 20% of the price of materials.

But if you buy everything yourself, then it can only be a car rental. There are options with free shipping if you order materials through online stores with a certain amount of order.

Waste removal on a budget

Construction waste removal is included in the estimate after each subsection. It is desirable after dismantling, roughing and finishing work.

Please note that ordering a car, collecting garbage in bags, cleaning the premises can also be included in the estimate as hidden work. Even the most solid builders will not do it for free.

For garbage disposal, containers with a volume of up to 8 m 3 and a load capacity of up to 5 tons are rented more often than others.

And again - if you collect everything yourself and can take it out - then all that remains is to order a container. And if there is a place to store garbage, then you can get by with its one-time export.

  • Immediately draw up a plan of the apartment with dimensions. It will help you with the calculation of consumables.
  • Calculate separately each amount of work - the area of ​​​​walls, floors and ceilings, the length of molded products for all repaired premises.
  • Determine whether it is necessary to change engineering communications (pipes, electrics).
  • Count the number of sockets, switches, faucets and related fittings, as well as such trifles as screws and self-tapping screws.
  • Determine who will be involved in the purchase of materials, delivery and lifting to the floor, as well as the removal of construction debris.
  • Distribute the entire scope of work separately to the premises, so it is easier to control the process.

Be prepared for the fact that it is impossible to accurately calculate the time and cost of repairs on your own, without any experience.
This doesn't mean you shouldn't try.

A huge help for an accurate calculation of the estimate is the design project of the premises. The probability of an error is practically excluded, unless you want to do something differently than it is calculated in the project. But the designer is a separate expense item. Do you need it, it's up to you!

Anyone who wants to build a house or make repairs in an apartment initially calculates how much it will cost him. For complete clarity, it is necessary to draw up a list of necessary materials and work, as well as their cost. Based on this, it will be possible to find out how much money is needed. And also decide whether to involve builders or do everything yourself. Not everyone knows how to make an estimate, what positions to include in it and how to calculate everything correctly. Let's try to figure this out.

What is an estimate

An estimate is a document that systematizes all the costs of the upcoming construction or repair. This can be easily done on your own, without having specially designed programs.

How to make an estimate on your own? It is enough to have the Excel program on your computer. It is necessary to carry out the calculation of funds and materials very carefully in order to avoid errors and exceeding the planned costs. It should display everything to the smallest detail.

Common Mistakes

When drawing up estimates, many make mistakes, which then come out and provoke unforeseen waste:

  • Calculations are carried out without a preliminary inspection of the object on which the work will be performed.
  • Additional expenses that may arise in case of force majeure are not included.
  • The full list of works and materials is not taken into account.

The main expense document for repairs or construction requires a serious approach and accurate calculations. Otherwise, you may get incorrect results.

What is needed for a competent budgeting

Before drawing up an estimated estimate for construction or repair, first of all, it is necessary to inspect the object. After that, a list of all ongoing work should be compiled.

How to draw up a budget? You need to know construction technology. Without this, it is impossible to correctly and correctly calculate and record all upcoming expenses. Therefore, we recommend that before making an estimate, study the sequence of the production cycle of work that needs to be evaluated. This will help to understand the need for ongoing operations and the need for building materials.

The main items of the estimate

Any construction estimate consists of three main positions:

  • materials;
  • Job;
  • transport.

All other items (the cost of electricity, equipment operation, etc.) are added to them.

In the first position indicate the list of necessary materials for each cycle of work, unit of measurement, quantity and price. For example: brick, glue, plaster, cement, wallpaper, linoleum and others. This also includes "consumables" (brushes, rollers, gloves, etc.). Before you make an estimate, find out the cost of materials directly in the store, or find on the Internet on sites specializing in the sale of building materials.

The second position includes a listing of all actions performed. Here it is necessary to take into account both preparatory and finishing work, their complexity and the conditions in which they are carried out. For example, you need to paste over the room with new wallpaper. To do this, you will need to carry out preparatory work: remove the old coating, clean the walls, prime them. The approximate cost of the necessary work can be found in the ads.

The position "transport" includes: delivery of materials, unloading, removal and removal of construction debris, indicating each item on a separate line. Information about the cost of these services is provided in the price lists of firms.

Drawing up an estimate for the repair of an apartment

How to draw up an estimate in order to carefully plan the repair work in the apartment, finish them in a short time with minimal costs? First you need to decide what kind of repair you will do: cosmetic or major. It depends on the amount of materials needed and the amount of work. If you decide to carry out a major overhaul, then the estimate should be divided into two parts:

  • repair and finishing works;
  • draft and finishing materials.

How to learn how to make an estimate to avoid mistakes? To do this, you should inspect all the premises of the apartment, measure the surface area of ​​walls, floors, window slopes, compile a list of finishing and draft materials, determine the cost and scope of work for each room separately.

Example

Here is an example of how to make an estimate for repairs. Prices and consumption of materials are fictitious.

Repair and finishing works:

Place of work

Type of work

unit of measurement

Quantity

Price per unit of measurement, rub.

Total amount, rub.

Putty

alignment

Painting

alignment

Putty

Wallpapering

Dismantling

Laying tiles

Skirting boards

Dismantling

Installation

Sockets, switches

Total

Consumables and finishing materials:

Material

unit of measurement

Quantity

Unit price

total amount

Starting putty

Finishing putty

Wallpaper glue

acrylic paint

Tile adhesive

Skirting boards

Socket, switch

Gloves

Total

Transport:

To get the preliminary results of the cost of repairing an apartment, you need to add up the total amounts from each column.

18819 + 7870 + 4000 = 30689 (rubles)

You should be aware that the final costs always come out more by 10-15%.

30689 + 15% = 35292.35 (rubles)

The principle of calculating construction costs is no different from estimates for repairs. Only production cycles and materials will change. How to make an estimate for construction with minimal costs? To do this, you need to carefully plan all the work, clarify what materials will be needed, find out the prices.

Drawing up an estimate is a very important stage from which you need to start any repair or construction. A properly drawn up document will help to carefully plan and rationally allocate costs - both material and money. The main thing is to take the calculations seriously and perform them as accurately as possible.

Discount on estimate 35%

  • 00 days
  • 00 hours
  • 00 min.
  • 00 sec.
SUBMIT YOUR APPLICATION

No
prepayment

Warranty
3 years

Treaty
with LLC "Prestige"

Free
payment estimates

All of us periodically face the need to repair and furnish the apartment. First, it is worth deciding whether we just want to update the room or completely change its appearance? After that, we evaluate our financial capabilities. It is also necessary to choose the style of the apartment, for this we review the photos on the website or in magazines. Style should reflect the character of the owners and demonstrate taste. We decide on the color of the walls and ceiling. The combination of colors should be harmonious. If possible, it is better to repair the entire apartment. Too much debris and dirt remains after the repair.

To draw up the main stages of repair, you need a general plan of the apartment with the dimensions of windows and doors. The purchase of materials and tools depends on how correctly the work plan is drawn up. It is necessary to determine the start and end dates of the repair so that it does not stretch for many months.

Repairs begin with the dirty robots themselves: replacing windows, removing door frames, chasing walls for electrical wiring, sockets and switches, removing old wallpaper, whitewashing, plastering. We dismantle the old tiles in the bathroom, bathroom and kitchen. After that, we dismantle the pipes, if necessary.

We start the remodeling process with the bathroom and kitchen. When repairing premises, most of all dirt and dust remains. We put tiles on the aligned walls. It cleans well and is indispensable for wet rooms. We immediately solve the issue of replacing the bathroom, toilet bowl and sink. Then, in turn, we repair all the rooms, starting with the farthest. The renovation of the corridor is done last.

The most time-consuming and monotonous type of work is putty. There are many types of starting and finishing putty. If the walls have to be leveled a lot, then the stage of plastering work is extended. Thick layers dry more slowly. For a stronger adhesion of putties and the surface of the wall and ceiling, they are pre-primed. After complete drying, make the finishing putty. Smooth surfaces of walls and ceilings are the main thing to do the job right.

The quality of the floor of the apartment depends on the screed. You can make a classic screed from a cement-sand mortar. With the development of repair technologies, self-leveling flooring has also begun to be used. If you have an apartment on the ground floor, then underfloor heating will be a great solution. There are many types of flooring offered on the market: parquet, laminate, linoleum, etc. Any of them can be laid on a flat floor.

Painting work is carried out only after the final drying of ceilings, walls and floor screed. After that, we carry out whitewashing or painting the ceiling. Next, we install interior partitions or doors. We pay special attention to the choice and gluing of wallpaper. Wallpaper design can support any renovation concept, and proper gluing is the basis for creating an apartment interior. Last of all, we install skirting boards, platbands, plumbing and decor.

We decided on the sequence of work. Now a few words about the purchase and delivery of materials. Materials are the main cost item. Starting and finishing putty, primer, water-based paint and wallpaper are suitable for walls and ceilings. For the floor, you need to choose the appropriate coating and material for the screed. For the bathroom, kitchen, bathroom, you will need tiles, glue and a fugue. Faucets in the bathroom and kitchen need to be replaced. It is necessary to accurately calculate the number of wallpapers and tiles, as the color in different batches may vary.

If you hire builders, you don't have to worry about tools, they prefer to work with their supplies. We'll have to buy brushes for painting and a couple of spatulas. If you are going to do the renovation of the apartment yourself, then you should take care of the construction tool in advance. Modern materials require special tools. Buying them is expensive, so contact the rental.

When calculating the cost of any material, it is necessary to find out the area on which it will be applied, and multiply this number by the consumption rate. And do not forget to add 10% to your calculations of the amount of materials. Make a budget. If you decide to change the bathroom and toilet, add their cost to the total cost. If you forgot something, it doesn't matter. The hardware store has everything you need. You should have at least 30% of the amount calculated according to the estimate, because there will always be unplanned expenses during the repair process.

If you live in a renovated apartment, then do the alteration of each room separately. You can do the renovation yourself or hire a contractor, but remember that many of the above jobs require some skill. If you have not plastered before, did not screed floors and did not lay tiles, then it is better not to waste your energy on work and money on materials. It will be cheaper to hire professionals. In any case, double-glazed windows should be installed by a specialized company. The same applies to the front door. Treat fashionable redevelopment of apartments with caution. Do not damage load-bearing walls.

Estimate for the repair of a one-room apartment 44 sq.m

Name of works Unit from. Qty Price per one. Total price
Dismantling works
1 Complex of dismantling works sq.m 44 180 7920
2 Taking out the trash Complex 1 6000 6000
3 Total: 13920
Ceiling works (Finishing works)
1 Ceiling priming sq.m 44 30 1320
2 Priming with betocontact sq.m 44 60 2640
3 Ceiling plaster up to 3 cm. sq.m 44 320 14080
4 Ceiling putty for painting (2 layers) sq.m 44 190 8360
5 Ceiling grinding sq.m 44 88 3872
6 Painting the ceiling with water-based paint sq.m 44 180 7920
7 Installation of a ceiling plinth on glue (fillet) running meters 46 190 8740
8 Total: 46932
Wall works (Finishing works)
1 Plastering walls using the rule (without beacons) sq.m 116 290 33640
2 Wall putty sq.m 99,50 190 18905
3 Installation of perforated corner running meters 12,50 56 700
4 wall sanding sq.m 99,50 50 4975
5 Wall waterproofing sq.m 1,50 290 435
6 Priming walls with acrylic primer (2 times) sq.m 116 30 3480
7 Priming walls with betocontact sq.m 16,50 50 5800
8 Installation of partitions from cinder blocks, tongue-and-groove blocks sq.m 7 490 3430
9 Pasting wallpaper without adjusting the picture sq.m 99,50 160 15920
10 Wall tiling sq.m 16,50 680 11220
11 Grouting tiles sq.m 16,50 75 1238
12 Trimming tiles running meters 10 130 1300
13 Installation of a decorative corner running meters 5 48 240
14 Total: 101283
Floor works (Finishing works)
1 Floor waterproofing sq.m 2,70 290 783
2 Priming the floor with concrete contact sq.m 44 50 2200
3 Mounting the damper tape running meters 46 32 1472
4 Screed device with cement-sand mixture up to 5 cm sq.m 44 290 12760
5 Substrate laying sq.m 30,80 35 1078
6 Laying laminate in a straight line sq.m 30,80 240 7392
7 Trimming laminate running meters 6 88 528
8 Laying plywood on the floor under linoleum, parquet sq.m 30,80 180 5544
9 Laying tiles on the floor sq.m 2,70 650 1755
10 Grouting tiles sq.m 2,70 75 203
11 Trimming tiles running meters 1,20 130 156
12 Linoleum flooring, carpet sq.m 11 190 2090
13 Installation of a metal threshold running meters 2 180 360
14 Installation of plastic plinth running meters 46 90 4140
15 Total: 40461
Electric installation work
1 Laying power cables according to the location of sockets, laying grounding cables, laying low-voltage cables, installing socket boxes, junction boxes, installation and assembly of low-voltage and power shields, wall chasing, testing Complex of works 1 17500 17500
2 Total: 17500
Plumbing work
1 Installation of water purification filters, installation of a system against water leakage, installation of sewerage, installation of water supply routes, installation of a storage water heater, installation of outlets for hot water, cold water, welding of fittings, gating Complex of works 1 13000 13000
2 Installing a tub with piping PCS. 1 2600 2600
3 Production of a plumbing cabinet from plasterboard (the price depends on the size) PCS. 1 2960 2960
4 Installation of a toilet bowl (floor mounting) including plumbing PCS. 1 2300 2300
5 Total: 20860
Joinery
1 Installation of a single-sided door: installation of a box, leaf, insertion of hinges PCS. 2 1700 3400
2 Casing device running meters 20 80 1600
3 Latch handle insert PCS. 2 350 700
4 Total: 5700
Auxiliary work
1 Material lifting complex 1 7000 7000
2 Total: 7000
3 Total for work: 253656

* The prices indicated on the site are not a public offer (Article 435 of the Civil Code of the Russian Federation).

Any repair begins with the preparation of preliminary calculations, which reflect the estimated costs for specific types of work, as well as the cost of building materials, transportation costs and other expenditure items.

This applies to all types of work, and interior decoration, including. Before making an estimate for finishing work, you should find out the cost of materials where they will be purchased.

What is needed for calculations?

Estimates for repair and finishing work can be drawn up both independently, by the owner of the premises, and with the help of an invited specialist.

If you use the services of workers, then coordinate these calculations with them, as this will help you avoid unnecessary misunderstandings in the future when paying them.

The estimate for interior finishing works is made taking into account the area of ​​​​your premises, the cost of the selected materials, the amount of work, the cost of renting a tool or equipment.

The cost of delivering materials and lifting them to your floor is also taken into account.

Different construction companies offer different prices for their services. Here it is important to choose a contractor who is distinguished by honesty, conscientiousness and compliance with the terms of contractual obligations.

It is best to look for them according to the reviews of your friends. If you decide to save on the cost of work, then contact novice craftsmen who do not require too high fees for work.

But here there is a risk of obtaining a not very high-quality result.

Due to the constant rise in the cost of the building assortment, the estimate for finishing work can also change in a fairly short period of time.

Therefore, make it shortly before the start of work. In particular, the estimates for finishing work in 2015 will be almost double those of 2014.

Alternatively, you can use ready-made estimates for finishing work. For example, if the size of your room fits the finished calculation, and you are satisfied with the prices and all the materials used.

How is the budget made?

Estimates for finishing work are done manually or using special programs.

If there is a small amount of work to be done, and you already have experience in preparing such documentation, then it is quite possible to independently draw up an estimate form for finishing work.

This is done as follows:

  1. Draw a sheet of paper in the form of a table.
  2. In one column, enter the name of the work or the name of the building material.
  3. In the second column, indicate the cost per unit of material or the cost per square meter of work.
  4. In the third column, reflect the required amount of materials or the total amount of work with this material.
  5. And in the last column, indicate the final cost of the work or material.
  6. After filling in all the columns, add up the total cost of all work and all materials.
  7. Add tool depreciation and shipping costs.

This will be your estimate for finishing. However, two separate estimates can be drawn up. One of them will indicate the cost of all finishing and auxiliary materials, and the other - the cost of all finishing work.

If you wish, you can find sample estimates for finishing work, which can be used as auxiliary tables.

In them you will find such seemingly insignificant things that you could lose sight of due to inattention. And they also incur certain costs.

When using special programs, of which there are a lot on the network, it will be enough for you to enter the available data into the estimate template for finishing work, and then click the "Calculate" button.

The list of applications is as follows:

  • My Estimate (2009);
  • Mini Estimate;
  • Estimate-D;
  • AvanEstimate.

In fact, there are many more programs, and only the first search results are presented above. They differ mainly in the interface and a number of features.

An example of an estimate for the interior decoration of a room

We give an example of an estimate for finishing work. The estimate of the cost of finishing works was considered.

Job title Footage unit of measurement Cost per unit Sum
Wall plastering 100 sq. m $4 $400
Wall primer 100 sq. m $0,1 $10
Wallpapering 100 sq. m $1,5 $150
Plasterboard ceiling installation 30 sq. m $5 $150
Ceiling putty 30 sq. m $3 $90
ceiling painting 30 sq. m $1,5 $45
Installation of lighting fixtures 10 Number of devices $1 $10
Hidden lighting installation individually $20 $20
slope finishing 5 sq. m $12 $60
Production of concrete screed 30 sq. m $3 $90
Laminate flooring installation 30 sq. m $2 $60

The total cost of finishing and repair work is calculated. In our case, the estimated cost of finishing work for this room will be $1085.

Practice shows that the construction estimate for finishing work, which you calculated, should be increased by 10-15%.

This comes from the possibility of possible unexpected expenses that all craftsmen face. Especially if you invite a repair team.

To draw up an estimate for building materials, a more impressive list will be required. It should reflect not only basic materials, such as wallpaper, flooring, drywall, lamps, paint, putty.

The list should list consumables and auxiliary materials. For example:

  • self-tapping screws;
  • brushes;
  • kleimers;
  • nails;
  • wires;
  • insulating materials.

The estimate for finishing work will help you accurately and quickly calculate the cost of work and materials, prepare more carefully for the start of work, and find a more suitable option with the invitation of specialists.

Thus, your family budget will be more reliably protected from unforeseen expenses and unpleasant surprises.

Compilation example (video)